Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
1961 [2009/08/23 14:13]
historian
1961 [2009/08/23 14:14] (current)
historian
Line 11: Line 11:
 d. Upon completion of Qualification Tests, 11 February 1961, KING proceeded to Pearl Harbor and the Equator on her Shakedown Cruise. d. Upon completion of Qualification Tests, 11 February 1961, KING proceeded to Pearl Harbor and the Equator on her Shakedown Cruise.
  
-<box 425px round blue center | USS KING (DLG-10) - USS KING in dry dock, Pearl Harbor, HI - March 1961 //(from Gerry Cook, Plankowner)//​ > {{ :​196103xx-cook-drydock01.jpg?​400x272 }} </​box>​+<box 425px round blue center | USS KING in dry dock, Pearl Harbor, HI - March 1961 //(from Gerry Cook, Plankowner)//​ > {{ :​196103xx-cook-drydock01.jpg?​400x272 }} </​box>​
  
 KING returned to San Diego, 28 March 1961 and commenced underway Training. Underway Training was ompleted with an overall grade of Excellent. ​ KING returned to San Diego, 28 March 1961 and commenced underway Training. Underway Training was ompleted with an overall grade of Excellent. ​